Bay Creek January 2026 Construction Update

Bay Creek continues to make steady progress this month as both residential and resort construction activities advance throughout the community. Located along Virginia’s scenic Chesapeake Bay in Cape Charles, Bay Creek blends coastal charm with a comprehensive selection of lifestyle amenities. Residents and members enjoy private beaches, a preserved natural landscape, and two championship golf courses designed by Arnold Palmer and Jack Nicklaus.

Ongoing enhancements to community facilities, infrastructure, and recreation areas further elevate Bay Creek’s reputation as one of the premier destinations for relaxed coastal living on the Eastern Shore.

Construction Progress

Drone image of Bay Creek homes under construction along paved streets and waterfront ponds, highlighting active residential development and infrastructure work within the rural EB5 project.

Real Estate Construction

Village F – Scott’s Landing – Phase I

Phase I permitting activities progressed steadily over the past month. The Phase I Resource Protection Area mowing permit was issued and all approved mowing activities were completed.

Significant construction milestones were achieved during Phase I. Bulk earthwork is now 100% complete. Installation of all major underground utilities has also been finalized, including the vacuum sewer main line, water main line, sewer laterals, and water services.

American Water installed new mainline sewer valves. Scheduled water and sewer tie-ins and system testing are planned for late January.

Infrastructure improvements continued with the completion of all Phase I ANEC road crossings. Road grading for Phase I is underway, with stone delivery scheduled for January to support continued progress.

Village F – Scott’s Landing – Phase II

Preliminary land planning for Phase II is now 100% complete, establishing the framework for continued development of the village.

All preliminary geotechnical fieldwork has been completed. Soil borings were finalized, and the final geotechnical report has been received, providing the necessary foundation data for design and permitting.

Aerial photo of active site grading and earthwork at Bay Creek, with heavy equipment preparing future residential lots surrounded by pine forests, reflecting early-stage development progress for EB5 investors.

Village CA-1 – Clubhouse Area

Preliminary engineering investigations are underway, with approximately 50% of the evaluation of existing water and sewer conditions completed. A formal project proposal has been requested to advance the next phase of engineering work.

The topographic survey for the site is 100% complete, supporting detailed design and engineering activities.

Elevated drone view of Bay Creek construction near winding waterways, showing framed homes, cleared lots, and ongoing infrastructure installation within the rural EB5 master-planned community.

Aerial perspective of Bay Creek residential lots outlined for development, with paved roads, waterfront features, and nearby golf course terrain supporting long-term EB5 job creation.

Drone image of newly constructed and in-progress homes at Bay Creek, with coastal ponds and open lots visible, demonstrating steady residential buildout within the rural EB5 project.

Resort Construction

Enhancements to Bay Creek’s resort amenities continue to deliver visible improvements across the community.

Roof Work

The Clubhouse roof replacement is complete.

Overhead view of the Bay Creek golf clubhouse and surrounding course, with parking and amenities visible, highlighting completed recreational infrastructure that supports community growth and EB5 job creation.

Locker Room Renovations

Renovation work inside the locker rooms continued to move forward through December and early January. Tile installation is underway, with hallway work scheduled to begin shortly. HVAC is now installed and working.

Secured Senior Loan Structure

The Bay Creek EB-5 project is financed through a secured senior loan, supported by a first-lien mortgage on portions of the development site. Each EB-5 investor participates in a distinct loan tranche with a four-year term. This individualized structure is rare in EB-5 offerings, and the shorter term further sets Bay Creek apart from typical rural projects.

Phased Development Approach

Bay Creek has been under development for several years, with nearly 300 land lots sold over the past five years. The current development strategy uses a phased approach, allowing construction to be paced in line with market conditions. This method reduces exposure to market fluctuations and enhances the project’s long-term resilience.

Experienced Leadership

Bobby Masters has led Bay Creek’s development since January 2020. With over 40 years of experience in large-scale residential communities, he has overseen the creation of more than 30,000 homes across 25,000 acres. His expertise spans the design and management of high-end amenities, including golf courses, marinas, hospitality venues, and homeowner associations, positioning him to effectively guide Bay Creek’s ongoing growth.

Proven Regional Center Sponsor

Bay Creek is backed by EB5AN, a regional center operator with a strong history of managing low-risk EB-5 investments. More than 2,700 families from over 70 countries have selected EB-5 projects sponsored by EB5AN regional centers.

Learn More About Bay Creek

Bay Creek is recognized in the EB-5 market for combining solid project security with reliable immigration outcomes. Its secured senior loan structure and phased development approach make it a standout investment opportunity.

For more information on the Bay Creek project or other available EB-5 projects, please schedule a one-on-one call with EB5AN.